The Kali Kamoning Watershed in Sampang Regency, spanning 35,421.15 Ha, experiences annual major floods affecting Sampang City. Despite various attempts and budget allocations at different administrative levels, flooding remains a persistent issue. A proposed solution is the implementation of an Ecodrains-based sponge village model for flood control, specifically targeting...
Project delays often serve as a catalyst for conflicts and disagreements between project owners and contractors, leading to significant financial implications. Such delays result in costly consequences for both parties involved. Contractors face the imposition of penalty fines as stipulated in the contractual agreement, alongside incurring overhead costs during the prolonged...
Contractors involved in construction projects face the crucial challenge of effectively managing time to ensure the timely completion of the project as stipulated in the contract, if not earlier. Efficient time management not only facilitates adherence to contractual obligations but also transforms incurred costs into profitable outcomes, thereby preventing financial penalties...
In constructing a toll road, the road structure will be carried out by constructing embankments on the road. However, in practice it often causes elevation differences between the two land surfaces, thereby increasing the risk of landslides. The objectives of the research are 1) Identifying the impact if Common Borrow Material (CBM) embankment work is replaced by rock embankment...
The problem in implementing the construction of the Madrasah Muallimin Muallimat Tambak Beras Jombang Building is that the available funds and time are limited. The approach regarding the material needed for this building work is light brick compared to other work items. In wall masonry work using light brick/hebel, it is necessary to analyze whether the work time can be faster...
Indonesia as an archipelago state is still need an equality development with the intention in achieving the goals to fulfill the requirement of structure and infrastructure. The economy that has experiencing growth, it can be seen with the rising of the demand for supply of electricity power whether it is coming from domestic moreover from industrial usages. Lampung Province, as...
In project implementation, change orders frequently arise post-contract signing between the owner and contractor. These changes often stem from design modifications or budget adjustments by the owner. Contractor-initiated change orders result from disparities between design plans and bill of quantities, insufficient design details, impractical field conditions, complex design...
Kediri is the third largest city in East Java after Surabaya and Malang with a population growth of 289,418 people in 2023. The International Airport will open at the end of 2023 in Kediri. However, rapid population growth has also led to an increase in mobility and the number of motorized vehicles on the streets of Kediri City, including at the research site in Dhoho Plaza. The...
Implementation of construction projects often faces delays in work completion. Delays in project completion that exceed the time limit specified in the contract cause losses both from the contractor as the executor and the assignor. Project implementers pay more attention to the cost aspects incurred and often ignore the time control of project implementation so that project...
Along with technological developments in the field of project work implementation, it must also be accompanied by developments in the field of Management as a control function in the implementation of the project. In this case, the application of the Earned Value Concept Method is expected to be able to provide an alternative solution to the problem of evaluating the cost and...
One of the project types is the Construction Project. The main activity components of this type of project consist of feasibility assessment, engineering design, procurement and construction. In construction projects very often delays occur where the realization in the field does not match the schedule of the implementation plan, due to several factors that occur, even though a...
In the construction project of the Pasuruan Regency BPBD building complex which is currently still running, there have been problems related to the schedule for the implementation of its activities. The problem in question is the delay in the schedule for the implementation of its activities. where the results of the progress realization are not in accordance with the schedule...
Research on the Aloha flyover construction project aims to determine the risks that occur in the workmanship of installing steel box girder, knowing the level of risk that occurs in the workmanship of installing steel box girder and knowing how to control the risks that occur in the workmanship of installing steel box girder. The method used in this research is the Hazard...
The government is building toll roads in various regions in Indonesia to realize economic acceleration and minimize economic inequality in society. However, based on facts on the ground, there are still many delays in toll road construction projects which are detrimental so it is necessary to take steps to accelerate the work. The aim of this research is to analyze the time and...
The Occupational Safety and Health Management System (SMK3) is a comprehensive framework that is used to regulate various activities and manage occupational safety and health (K3) in a systematic manner. In the context of the Probolinggo Banyuwangi Toll Road Development Project Package 1, the implementation of SMK3 was assessed to determine the level of implementation, identify...
A total of 5,354 MBR individuals have applied to reside in Rusunawa and have remained on the waiting list until 2022. This has prompted the Surabaya City Government to provide Rusunawa, with one of them located in Tambak Wedi Village, Kenjeran District, Surabaya City. The objective of this research is to assess the viability of investing in the construction of Rusunawa Tambak...
Jabung District is a sub-district located in the Malang Regency area of 135.89 km2 or around 4.56 percent of the total area of Malang Regency. This sub-district consists of 15 villages, including Argosari, Gadingkembar, Gunungjati, Jabung, Kemantren, Kemiri, Kenongo, Ngadirejo, Pandansari Lor, Sidomulyo, Sidorejo, Slamparejo, Sukolilo, Sukopuro, and Taji. With a population of 74...
The Supervisory Consultant is the party assigned by the project owner to realize the planned planning results according to the development of good settlement infrastructure facilities and utilities. The government, especially in the PRKP Division of East Java Province, collaborates with service providers, one of which is a supervisory consultant, in this case encouraging...
In construction project control, the main factors of concern are quality, time and cost control. So it is necessary to use one method in the implementation of its control. This study aims to analyze the time and cost of the Raci OPD Office Building Construction project. The benefit of this research is to anticipate potential delays that occur in the project. The problem...
The implementation of construction work has the main targets in construction management, such as construction costs, quality of construction work and construction implementation time. Construction activities can be declared successful in their management if they produce work products with the quality criteria that have been determined, on time, and according to the agreed costs...
Construction projects are a job sector that has level risks and work accident , this is caused consequence low awareness to application Occupational Safety and Health (K3) and in accordance with the regulations applicable legislation. Often application of K3 to a construction project considered only as a cost expense , not as an investment to prevent happen work accidents but can...
In construction projects, inadequate implementation of the Occupational Safety and Health Management System (OHSMS) poses risks to the safety and well-being of workers, resulting in decreased performance and compromised project quality. This study focuses on the Kapas-Glendeng bridge widening project in Bojonegoro Regency, identifying key obstacles such as workforce competence...
Water is a basic need for all living things on this earth, not least for individual humans themselves, that water is the support of daily activities for human survival. The average household water usage in Indonesia is 60 liters per day per person or 45% of the total usage is for drinking, cooking, washing clothes, cleaning houses and vehicles and performing worship. Kecamatan...
Infrastructure development plays a very important role as capital in efforts to stimulate increased economic productivity, both at the national and regional levels, as well as reducing unemployment, alleviating people from poverty and of course improving the standard of living of the community at large. Delays in completing a project are a problem that often arises and can have...
The development of road or toll road infrastructure in a country can be used as a benchmark to determine the level of economic progress of a country, both macro and micro. The location of toll exits has a significant effect in absorbing labor and creating new business activities. Projects are dynamic, so contractors must be responsive to changes in situations and conditions on...