OPERATIONAL RISK MANAGEMENT OF SURABAYA MAIN NAVAL BASE V REPAIR AND MAINTENANCE FACILITY BASED ON ISO 31000 FRAMEWORK
International Journal of ASRO
Volume 10, Number 03, pp. 111-123
July-Dec 2019
OPERATIONAL RISK MANAGEMENT OF SURABAYA MAIN NAVAL BASE
V REPAIR AND MAINTENANCE FACILITY BASED ON ISO 31000
FRAMEWORK
Yunus E. Patabang, Suprayitno, Erpan Sahiri, I Made Jiwa A.
Indonesian Naval Technology College,
Bumimoro-Morokrembangan, Surabaya 60187, Indonesia
ABSTRACT
Surabaya Main Naval Base V Repair and Maintenance Facility is one of the work units under the
auspices of the Indonesian Navy that is tasked with carrying out the maintenance and repair of all major
weapons systems of the Indonesian Navy. In carrying out their duties Surabaya Main Naval Base V Repair and
Maintenance Facility has a big challenge and even there are various kinds of risks to prepare all the Indonesian
Armed Forces defense equipment in accordance with the demands of need. Therefore, in this research, risk
management will be carried out at the Surabaya Main Naval Base V Repair and Maintenance Facility
Operational based on the ISO 31000: 2018 framework. Based on this framework, risk management will be
carried out, namely how to carry out risk assessments in the form of risk identification, risk analysis, and risk
evaluation for all risks in the operational field. Enterprise Risk Management (ERM) is also used to carry out indepth risk management processes. One method used to solve existing problems is to use the House of Risk
(HOR) method, which is divided into two stages. Stage 1 HOR focuses on ranking the Aggregate Risk Potential
(ARP) value and with the help of the Pareto diagram the cumulative ARP value is obtained to determine the risk
event (risk agent) selected, which then requires treatment on a priority scale. The results of this HOR phase 1
are then included in HOR phase 2 to rank the most effective prevention measures based on costs and
resources. From the results of the HOR phase 2, further brainstorming was carried out with the Surabaya Main
Naval Base V Repair and Maintenance Facility in accordance with the actions chosen for preventive actions that
could be immediately carried out.
Keywords: House of Risk, Enterprise Risk Management, SNI ISO 31000: 2018.
1.
INTRODUCTION.
Indonesian Navy Ships as one of the main
elements of the Navy's integrated fleet weapons
system is required to have combat readiness, so
that efforts are needed to maintain and improve the
condition of the Battle Ship so that it is always
ready to carry out its tasks. Based on this, it is
necessary to carry out maintenance and repairs of
the Indonesian Navy Ships to maintain and
maintain the technical condition of the ship in a
condition ready for operation. To achieve this, the
Indonesian Navy established a maintenance and
repair work unit known as the Navy's Maintenance
and Repair Facility. One of them is Surabaya Main
Naval Base V Repair and Maintenance Facility,
which has the main task of assisting the
Commander of the Surabaya Main Naval Base V in
carrying out repairs and maintenance in the field of
machinery,
shipping
navigation
equipment,
weapons, electronics, magnetic security, dimming
and fostering potential maritime services supporting
the main tasks of the Surabaya Main Naval Base V.
The current condition in Surabaya Main
Naval Base V Repair and Maintenance Facility,
there are still a number of incidents that are related
to the operation of the Surabaya Main Naval Base
V Repair and Maintenance Facility, which is
unexpected and detrimental to the Navy and
Surabaya Main Naval Base V Repair and
Maintenance Facility in particular. Some incidents
include delays and inadequate availability of repair
parts, work that is not completed on time, even at
the stage of lack of coordination between Surabaya
Main Naval Base V Repair and Maintenance
Facility and third parties in carrying out repair
operations. Research on risk management has
been carried out in Surabaya Main Naval Base V
Repair and Maintenance Facility, but only focused
on improving the Indonesian Navy Ships.
Therefore, in this study will examine risk
management in the operational field which includes
all operational Surabaya Main Naval Base V Repair
and Maintenance Facility. Risk management is an
inseparable part of management's responsibility in
ensuring the achievement of organizational goals.
Risk control can increase the effectiveness and
efficiency of management, because all risks that
can hinder the organization's processes have been
identified and can be handled properly.
Implementation
of
Enterprise
Risk
Management (ERM) is a very important thing
owned by a work unit, because the risks that occur
can be managed and minimized to achieve the
objectives of the work unit's organization. The
approach used to carry out ERM in this study is the
ISO 31000: 2018 framework. The process of risk
management, design goes through the stages of
risk identification, risk analysis, risk evaluation, risk
treatment, monitoring and review. In identifying and
measuring potential risks, the focus is on the
operations in Surabaya Main Naval Base V Repair
and Maintenance Facility, because the risks faced
can be seen in the operational section of
Fasharkan.
In the many research that has been done on
the risk management, design stage using a
separate method for each stage. In risk
identification using brainstorming, risk analysis uses
a risk matrix, risk evaluation uses the FMEA
(Failure Mode Effect of Analysis) method and the
last step is to treat risk using manual
recommendations. Therefore, in this study to
identify, analyze, evaluate and treat risk using the
House of Risk (HOR) model. This model is a
framework developed by Pujawan and Geraldin
(2011) by developing the FMEA method and the
Quality Function Deployment (QFD) method.
Broadly speaking, the advantages of this method
are the stages in the framework that have been
compiled to include one method that can be used to
carry out risk management analysis.
House of Risk is divided into two phases,
namely the first phase, risk identification is the
development of the QFD method. Then the second
phase, risk treatment is the development of the
FMEA method. The risk identification phase is the
phase in which risk events and risk agents are
identified, measured and prioritized. The risk
management phase is the phase in which risk
agents are selected based on the high priority level
of the first phase HOR output. After that, identify
relevant actions to prevent risk from arising and
determine the relationship between each preventive
action on each risk trigger. Then, calculate the level
of effectiveness and measure the level of difficulty
of each action used as a form of risk response or
mitigation. The HOR model has been applied in one
of the studies, namely Putri Amelia, Iwan Vanany,
Indarso, Operational Risk Analysis in the Warship
Division of PT. PAL Indonesia with the House of
Risk Method. The purpose of this study is to
identify, analyze and choose the sequence and risk
mitigation strategies associated with using the
House o (...truncated)