OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING

INDONESIAN MINING PROFESSIONALS JOURNAL, Mar 2024

Rencana operasi penambangan PT. Barasentosa Lestari (BSL), Sinarmas Mining tahun 2022 berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit Pinang dan pit Satelit dan 3 (tiga) disposal yaitu disposal OPD Lowwall, disposal OPD Highwall dan disposal IPD Satelit. Karakteristik lokasi disposal OPD Lowwall sisi utara merupakan zona rawa dengan kandungan air yang tinggi. Dengan karakteristik material rawa tersebut, proses penimbunan di area ini akan memicu pergerakan rawa dan timbunan yang berdampak terhadap aspek keselamatan, lingkungan, produksi dan juga akan berdampak kepada eksternal dan citra perusahaan. Sehingga dibutuhkan perencanaan dan penanganan yang tepat agar kapasitas volume disposal bisa optimal. Analisis geoteknik dilakukan terhadap rencana optimalisasi disposal OPD Lowwall dengan pendahuluan investigasi base timbunan zona rawa menggunanakan uji CPTu untuk mengetahui insitu strength, zona tekanan pori yg berlebih (zones of excess pore pressure) batas material soft serta laju konsolidasi untuk memberikan batasan FoS yang aman (FoS > 1,3). Kondisi material disposal dengan kondisi undrained juga menjadi faktor dalam penentuan slope stability analysis. Rekomendasi geoteknik adalah membuat counterweight pada zona rawa disposal OPD Lowwall sisi utara agar kapasitas dapat dioptimalkan lagi dengan tambahan kapasitas 900 kbcm di RL+35 – RL+80 dengan overall slope 50. Tahapan awal adalah membuat parit yang mengelilingi zona rawa untuk release aliran creek dari timur ke barat. Kemudian dimulai dari utara pekerjaan cut dan remove material soft dengan ketebalan 4 m di RL+26 sebanyak 45 kbcm di zona rawa. Pekerjaan cut diikuti pekerjaan fill secara paralel dengan material fill yaitu hard clay. Pekerjaan fill dilakukan dengan ketinggian per 3 m dari base RL+26 sampai RL+35 sebanyak 87.600 bcm.

Article PDF cannot be displayed. You can download it here:

https://jurnal.perhapi.or.id/index.php/impj/article/download/119/86

OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING

OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING Aries Gusti Umbu Dasa1, Adittama Prasetya Nugraha2* dan M. Okky Anriansyah3 1)Engineering Dept. Head, PT. Barasentosa Lestari, Plan Section Head, PT. Barasentosa Lestari, 3)Sr. Mine Plan Engineer, PT. Barasentosa Lestari 2)Mine Artikel masuk : 31-01-2024 , Artikel diterima : 27-02-2024 ABSTRAK Kata kunci: disposal, FoS, overall slope, counterweight, cut, fill Keywords: disposal, FoS, overall slope, counterweight, cut, fill Rencana operasi penambangan PT. Barasentosa Lestari (BSL), Sinarmas Mining tahun 2022 berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit Pinang dan pit Satelit dan 3 (tiga) disposal yaitu disposal OPD Lowwall, disposal OPD Highwall dan disposal IPD Satelit. Karakteristik lokasi disposal OPD Lowwall sisi utara merupakan zona rawa dengan kandungan air yang tinggi. Dengan karakteristik material rawa tersebut, proses penimbunan di area ini akan memicu pergerakan rawa dan timbunan yang berdampak terhadap aspek keselamatan, lingkungan, produksi dan juga akan berdampak kepada eksternal dan citra perusahaan. Sehingga dibutuhkan perencanaan dan penanganan yang tepat agar kapasitas volume disposal bisa optimal. Analisis geoteknik dilakukan terhadap rencana optimalisasi disposal OPD Lowwall dengan pendahuluan investigasi base timbunan zona rawa menggunanakan uji CPTu untuk mengetahui insitu strength, zona tekanan pori yg berlebih (zones of excess pore pressure) batas material soft serta laju konsolidasi untuk memberikan batasan FoS yang aman (FoS > 1,3). Kondisi material disposal dengan kondisi undrained juga menjadi faktor dalam penentuan slope stability analysis. Rekomendasi geoteknik adalah membuat counterweight pada zona rawa disposal OPD Lowwall sisi utara agar kapasitas dapat dioptimalkan lagi dengan tambahan kapasitas 900 kbcm di RL+35 – RL+80 dengan overall slope 50. Tahapan awal adalah membuat parit yang mengelilingi zona rawa untuk release aliran creek dari timur ke barat. Kemudian dimulai dari utara pekerjaan cut dan remove material soft dengan ketebalan 4 m di RL+26 sebanyak 45 kbcm di zona rawa. Pekerjaan cut diikuti pekerjaan fill secara paralel dengan material fill yaitu hard clay. Pekerjaan fill dilakukan dengan ketinggian per 3 m dari base RL+26 sampai RL+35 sebanyak 87.600 bcm. Adittama Prasetya Nugraha: Doi : https://doi.org/10.36986/impj.v5i2.119 61 Indonesian Mining Professionals Journal Volume 5, Nomor 2, November 2023: 61 - 70 ABSTRACT work was followed by fill work in parallel with the fill material, namely hard clay. Fill work was carried out with a height of 3 m from base RL+26 to RL+35 totaling 87 kbcm. The mining operation plan of PT Barasentosa Lestari (BSL), Sinarmas Mining in 2022 is located in Belani Block which has 2 (two) pits namely Pinang pit and Satelit pit and 3 (three) disposals namely OPD Lowwall disposal, OPD Highwall disposal and IPD Satelit disposal. The characteristics of the OPD Lowwall disposal site on the north side is a swamp zone with high water content. With the characteristics of the swamp material, the stockpiling process in this area will trigger swamp and stockpile movements that have an impact on safety, environmental, production aspects and will also have an impact on the company's external and image. Therefore, proper planning and handling is required to optimize the volume capacity of the disposal. Geotechnical analysis was carried out on the OPD Lowwall disposal optimization plan with a preliminary investigation of the swamp zone backfill base using the CPTu test to determine insitu strength, zones of excess pore pressure, soft material boundaries and consolidation rates to provide a safe FoS limit (FoS > 1.3). The undrained condition of the disposal material is also a factor in determining the slope stability analysis. The geotechnical recommendation is to make a counterweight in the swamp zone of the OPD Lowwall disposal on the north side so that the capacity can be optimized again with an additional capacity of 900 kbcm at RL+35 - RL+80 with an overall slope of 50. The initial stage is to make a trench around the swamp zone to release the creek flow from east to west. Then starting from the north, cut and remove soft material with a thickness of 4 m at RL+26 totaling 45 kbcm in the swamp zone. The cut PENDAHULUAN Rencana operasi penambangan PT. Barasentosa Lestari (BSL), Sinarmas Mining pada tahun 2022 berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit Pinang dan pit Satelit dan 3 (tiga) disposal yaitu disposal OPD Lowwall, disposal OPD Highwall dan disposal IPD Satelit. Tantangannya ada di jenis material Overburden (OB) yang kategorinya very low sampai medium strength dan area bukaan disposal yang terbatas. Berangkat dari tantangan tersebut maka yang salah satu potensial bisa dilakukan penambahan kapasitas disposal adalah dengan lift up disposal Lowwall sisi utara yang belum diaktifkan kembali. Kondisi disposal Lowwall sisi utara mengalami pergerakan horisontal 0,974 m resultant displacement dari hasil monitoring prisma geoteknik sebelum di lift up karena karakteristik lokasi tersebut merupakan zona rawa dengan kandungan air yang tinggi. Setelah kejadian tersebut maka ditambahkan monitoring extensometer oleh tim geoteknik BSL. Proses penimbunan di area ini akan memicu pergerakan rawa dan timbunan yang berdampak terhadap aspek keselamatan, lingkungan, produksi dan juga akan berdampak kepada eksternal dan citra perusahaan. Sehingga dibutuhkan perencanaan dan penanganan yang tepat agar kapasitas volume disposal bisa optimal. Gambar 1. Hasil Monitoring Prisma GT3 pada Disposal OPD Lowwall Sisi Utara 62 Indonesian Mining Professionals Journal Volume 5, Nomor 2, November 2023: 61 - 70 membuat counterweight pada zona rawa disposal OPD Lowwall sisi utara agar kapasitas dapat dioptimalkan lagi di RL+40 – RL+80. Counterweight meliputi pekerjaan cut dan remove material soft dengan ketebalan 4 m di RL+26 di zona rawa kemudian diikuti pekerjaan fill secara paralel dengan material fill yaitu hard clay. Pekerjaan fill dilakukan dengan ketinggian per 3 m dari base RL+26 sampai RL+35. Counterweight wajib dibentuk terlebih dahulu sebelum disposal lift up ke RL+40 – RL+80. Analisis tim geoteknik BSL dilakukan terhadap rencana optimalisasi disposal OPD Lowwall dengan pendahuluan investigasi base timbunan zona rawa menggunanakan uji CPTu untuk mengetahui insitu strength, zona tekanan pori yg berlebih (zones of excess pore pressure) batas material soft serta laju konsolidasi untuk memberikan batasan FoS yang aman (FoS 1,3). Kondisi material disposal dengan kondisi undrained juga menjadi faktor dalam penentuan slope stability analysis. Rekomendasi tim geoteknik geoteknik BSL adalah Gambar 2. Analisis Geoteknik terhadap Disposal OPD Lowwall Sisi Utara METODOLOGI PENELITIAN (DSP_LOM_V5) sisi utaranya mengikuti aktual topografi pada elevasi + (...truncated)


This is a preview of a remote PDF: https://jurnal.perhapi.or.id/index.php/impj/article/download/119/86
Article home page: https://jurnal.perhapi.or.id/index.php/impj/article/view/119/86

Umbu Dasa Aries Gusti, Nugraha Adittama Prasetya, M. Okky Anriansyah. OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING, INDONESIAN MINING PROFESSIONALS JOURNAL, 2024, pp. 49-60,