OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK, PT. BARASENTOSA LESTARI, SINARMAS MINING
OPTIMALISASI DISPOSAL OPD LOWWALL PADA ZONA RAWA SANGAT
LUNAK DAN JENUH AIR BERDASARKAN REKOMENDASI GEOTEKNIK,
PT. BARASENTOSA LESTARI, SINARMAS MINING
Aries Gusti Umbu Dasa1, Adittama Prasetya Nugraha2* dan M. Okky Anriansyah3
1)Engineering
Dept. Head, PT. Barasentosa Lestari,
Plan Section Head, PT. Barasentosa Lestari,
3)Sr. Mine Plan Engineer, PT. Barasentosa Lestari
2)Mine
Artikel masuk : 31-01-2024 , Artikel diterima : 27-02-2024
ABSTRAK
Kata kunci: disposal, FoS,
overall slope, counterweight,
cut, fill
Keywords: disposal, FoS,
overall slope, counterweight,
cut, fill
Rencana operasi penambangan PT. Barasentosa Lestari (BSL), Sinarmas Mining
tahun 2022 berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit Pinang dan pit
Satelit dan 3 (tiga) disposal yaitu disposal OPD Lowwall, disposal OPD Highwall dan
disposal IPD Satelit. Karakteristik lokasi disposal OPD Lowwall sisi utara merupakan
zona rawa dengan kandungan air yang tinggi. Dengan karakteristik material rawa
tersebut, proses penimbunan di area ini akan memicu pergerakan rawa dan timbunan
yang berdampak terhadap aspek keselamatan, lingkungan, produksi dan juga akan
berdampak kepada eksternal dan citra perusahaan. Sehingga dibutuhkan
perencanaan dan penanganan yang tepat agar kapasitas volume disposal bisa
optimal. Analisis geoteknik dilakukan terhadap rencana optimalisasi disposal OPD
Lowwall dengan pendahuluan investigasi base timbunan zona rawa menggunanakan
uji CPTu untuk mengetahui insitu strength, zona tekanan pori yg berlebih (zones of
excess pore pressure) batas material soft serta laju konsolidasi untuk memberikan
batasan FoS yang aman (FoS > 1,3). Kondisi material disposal dengan kondisi
undrained juga menjadi faktor dalam penentuan slope stability analysis. Rekomendasi
geoteknik adalah membuat counterweight pada zona rawa disposal OPD Lowwall sisi
utara agar kapasitas dapat dioptimalkan lagi dengan tambahan kapasitas 900 kbcm
di RL+35 – RL+80 dengan overall slope 50. Tahapan awal adalah membuat parit yang
mengelilingi zona rawa untuk release aliran creek dari timur ke barat. Kemudian
dimulai dari utara pekerjaan cut dan remove material soft dengan ketebalan 4 m di
RL+26 sebanyak 45 kbcm di zona rawa. Pekerjaan cut diikuti pekerjaan fill secara
paralel dengan material fill yaitu hard clay. Pekerjaan fill dilakukan dengan ketinggian
per 3 m dari base RL+26 sampai RL+35 sebanyak 87.600 bcm.
Adittama Prasetya Nugraha:
Doi : https://doi.org/10.36986/impj.v5i2.119
61
Indonesian Mining Professionals Journal Volume 5, Nomor 2, November 2023: 61 - 70
ABSTRACT
work was followed by fill work in parallel with the fill
material, namely hard clay. Fill work was carried out
with a height of 3 m from base RL+26 to RL+35 totaling
87 kbcm.
The mining operation plan of PT Barasentosa Lestari
(BSL), Sinarmas Mining in 2022 is located in Belani
Block which has 2 (two) pits namely Pinang pit and
Satelit pit and 3 (three) disposals namely OPD Lowwall
disposal, OPD Highwall disposal and IPD Satelit
disposal. The characteristics of the OPD Lowwall
disposal site on the north side is a swamp zone with
high water content. With the characteristics of the
swamp material, the stockpiling process in this area will
trigger swamp and stockpile movements that have an
impact on safety, environmental, production aspects
and will also have an impact on the company's external
and image. Therefore, proper planning and handling is
required to optimize the volume capacity of the
disposal. Geotechnical analysis was carried out on the
OPD Lowwall disposal optimization plan with a
preliminary investigation of the swamp zone backfill
base using the CPTu test to determine insitu strength,
zones of excess pore pressure, soft material
boundaries and consolidation rates to provide a safe
FoS limit (FoS > 1.3). The undrained condition of the
disposal material is also a factor in determining the
slope stability analysis. The geotechnical
recommendation is to make a counterweight in the
swamp zone of the OPD Lowwall disposal on the north
side so that the capacity can be optimized again with
an additional capacity of 900 kbcm at RL+35 - RL+80
with an overall slope of 50. The initial stage is to make
a trench around the swamp zone to release the creek
flow from east to west. Then starting from the north, cut
and remove soft material with a thickness of 4 m at
RL+26 totaling 45 kbcm in the swamp zone. The cut
PENDAHULUAN
Rencana operasi penambangan PT. Barasentosa
Lestari (BSL), Sinarmas Mining pada tahun 2022
berada di Blok Belani yang terdapat 2 (dua) pit yaitu pit
Pinang dan pit Satelit dan 3 (tiga) disposal yaitu
disposal OPD Lowwall, disposal OPD Highwall dan
disposal IPD Satelit. Tantangannya ada di jenis
material Overburden (OB) yang kategorinya very low
sampai medium strength dan area bukaan disposal
yang terbatas. Berangkat dari tantangan tersebut maka
yang salah satu potensial bisa dilakukan penambahan
kapasitas disposal adalah dengan lift up disposal
Lowwall sisi utara yang belum diaktifkan kembali.
Kondisi disposal Lowwall sisi utara mengalami
pergerakan horisontal 0,974 m resultant displacement
dari hasil monitoring prisma geoteknik sebelum di lift up
karena karakteristik lokasi tersebut merupakan zona
rawa dengan kandungan air yang tinggi. Setelah
kejadian tersebut maka ditambahkan monitoring
extensometer oleh tim geoteknik BSL. Proses
penimbunan di area ini akan memicu pergerakan rawa
dan timbunan yang berdampak terhadap aspek
keselamatan, lingkungan, produksi dan juga akan
berdampak kepada eksternal dan citra perusahaan.
Sehingga dibutuhkan perencanaan dan penanganan
yang tepat agar kapasitas volume disposal bisa
optimal.
Gambar 1. Hasil Monitoring Prisma GT3 pada Disposal OPD Lowwall Sisi Utara
62
Indonesian Mining Professionals Journal Volume 5, Nomor 2, November 2023: 61 - 70
membuat counterweight pada zona rawa disposal OPD
Lowwall sisi utara agar kapasitas dapat dioptimalkan lagi
di RL+40 – RL+80. Counterweight meliputi pekerjaan cut
dan remove material soft dengan ketebalan 4 m di
RL+26 di zona rawa kemudian diikuti pekerjaan fill
secara paralel dengan material fill yaitu hard clay.
Pekerjaan fill dilakukan dengan ketinggian per 3 m dari
base RL+26 sampai RL+35. Counterweight wajib
dibentuk terlebih dahulu sebelum disposal lift up ke
RL+40 – RL+80.
Analisis tim geoteknik BSL dilakukan terhadap rencana
optimalisasi disposal OPD Lowwall dengan
pendahuluan investigasi base timbunan zona rawa
menggunanakan uji CPTu untuk mengetahui insitu
strength, zona tekanan pori yg berlebih (zones of excess
pore pressure) batas material soft serta laju konsolidasi
untuk memberikan batasan FoS yang aman (FoS 1,3).
Kondisi material disposal dengan kondisi undrained juga
menjadi faktor dalam penentuan slope stability analysis.
Rekomendasi tim geoteknik geoteknik BSL adalah
Gambar 2. Analisis Geoteknik terhadap Disposal OPD Lowwall Sisi Utara
METODOLOGI PENELITIAN
(DSP_LOM_V5) sisi utaranya mengikuti aktual
topografi pada elevasi + (...truncated)